Friday, 5 June 2015

Dawson - Home Renovations Part 2

05 June 2015

Updating the progress of constructing our humble adobe for the last 6 weeks!

  • Painting works for the house - touch-ups required after the window drillings...
  • Wardrobe installed for the bedrooms...
  • Hollywood style mirror vanity top for MBR...
  • Carpentry for the kitchen, kitchen sliding door, TV console and shoe cabinet are done...
  • Brick wall - completed with very very minor touch-ups to do...
  • Lamination for the storeroom door done...
  • Lightings are installed!
  • Installation of invisible window grills...

Pending to-dos;

  • Installation of roller blinds, windows at the service yard...
  • Cleaning all windows and carpentry...
  • Delivering of sofa, bed frame, dining table, study table, mirror with frame for 财位...
  • Coordinate with the movers for quotation and moving details...
  • Packing, packing and packing...!

Currently trying to resolve the power tripping issues (switches on tripped, no on also tripped)... but hey, ALMOST... almost ... and we are almost near to the moving-in date!  :)  Here are some photos taken over the past weekends on the progression...

Living hall area; (from clockwise) storeroom door, TV console, Brick wall and shoe cabinet


Kitchen; my most sophisticated area in the whole house... (don't cook like an expert, but must look like a cook expert!) 


Rooms; playing with colors!


Rooms; carpentry (watch out for my hollywood-style vanity top!)


Lightings; all up (almost spent $2K on lighting accessories)!